Skip to content

New Court Builds

Tennis Court Installation in San Antonio

A regulation playing surface, built to last through South Texas heat, starting with your site’s actual dimensions and drainage.

  • On-Site Evaluation
  • Itemised Written Estimate
  • Final Walkthrough
  • San Antonio & Surrounds
A blue and tan outdoor tennis court viewed through an open chain-link fence on a sunny day.

Build It Right

Where rushed tennis court builds fail, and what a proper build does differently

Skipped Subgrade Work

Clay-heavy soil left uncompacted shifts after the first wet season, cracking the slab from below within two years.

Subgrade Compaction First

The builder tests and compacts the subgrade before any base is poured, eliminating the soft spots that cause early cracking.

Poor Drainage Slope

A base poured without a measured surface slope traps standing water, degrading the acrylic coating and making the court unplayable after rain.

Graded Drainage Built In

Site grading is set to a consistent slope so water clears the surface quickly and does not pool at the baseline or net posts.

Undersized Footprint

Laying lines without accounting for run-off clearance leaves no safe stopping distance, and the court fails regulation layout from day one.

7,200 Sq Ft Planning

The builder measures the full 7,200 sq ft footprint, playing area plus run-off, before grading begins, so the layout is regulation-compliant.

UV-Weak Surface Coat

A single-pass or low-grade coating fades and chalks within one South Texas summer, leaving uneven traction and illegible lines.

Multi-Pass Acrylic Coating

A UV-resistant acrylic coating applied in multiple passes delivers consistent color, traction, and line visibility through years of direct sun.

Common problems, answered

Scope of Work

What the installation covers

A full build from raw ground to a regulation court, with every component handled in sequence.

Site Measurement & Fit Check

The builder measures the available area against the 7,200 sq ft planning figure and checks slope before any work is scoped.

Grading & Drainage Preparation

Ground is leveled and graded to a consistent slope so water clears the surface and does not collect at low points.

Base Construction

A 4-inch compacted stone subbase is laid, then topped with either a concrete slab or asphalt layer suited to the site conditions.

Acrylic Surface Coating

Multiple passes of UV-resistant acrylic coating are applied once the base reaches its full cure interval, delivering a consistent playing surface.

Net Post Installation & Line Striping

Net posts are set in concrete footings at regulation height, and full line striping covers baselines, service boxes, and both sideline sets.

Concrete Slab Base

Long-term stability for residential and club courts.

Asphalt Base Layer

Flexible alternative suited to larger or commercial sites.

Perimeter Fencing

Quoted as a separate line item alongside the base build.

Run-Off Clear Space Planning

12 ft behind baselines, 6 ft on each sideline, measured first.

Site to Finished Court

What a full tennis court build requires from your property

The 78-by-36-foot playing area is just the start, run-off clearance, subgrade work, and drainage planning determine whether the site is a realistic fit.

A full-size tennis court needs approximately 7,200 square feet including the recommended run-off clearance of 12 feet behind each baseline and 6 feet on each sideline. The builder measures the available space and checks the slope before any grading is quoted. San Antonio’s clay-heavy soil often has soft spots that require additional subgrade compaction or fill to prevent the base from shifting after the first heavy rain season.

Base construction uses either a concrete slab or an asphalt layer over compacted stone subbase. A 4-inch compacted stone subbase under concrete is standard for residential installs in South Texas, where drainage behavior and heat expansion both affect long-term slab stability. Once the base reaches its full cure interval, an acrylic surface coating is applied in multiple passes to deliver a UV-resistant, consistent playing surface.

Net posts are set in concrete footings at the regulation 42-inch center height, with the net tensioned to 36 inches at the center strap. Line striping covers the full regulation layout including service boxes, baselines, and singles and doubles sidelines. Perimeter fencing is quoted as a separate line item. The builder completes a final walkthrough confirming surface flatness, drainage flow, and net post alignment before the job is signed off.

Why Choose Us

Why choose our partners for tennis court installation in San Antonio?

Local site knowledge, a written scope before work begins, and a final walkthrough that confirms every specification is met.

On-Site Evaluation Before Any Commitment

Every enquiry starts with a site visit to assess space, slope, and drainage, no scope is written from a phone call alone.

Itemised Written Estimate

Base prep, acrylic surfacing, fencing, and line marking are listed as separate line items so nothing is hidden in a lump sum.

South Texas Site Experience

Our local partners know San Antonio’s clay soil conditions and plan subgrade work accordingly before the base is poured.

Signed-Off Final Walkthrough

The builder checks surface flatness, drainage flow, and net post alignment with you before the job is considered complete.

Residential & Commercial Scope

We arrange builds for backyard courts, HOA facilities, school campuses, and commercial properties across the San Antonio area.

A completed sports court builder job at a house
A finished sports court builder project

The Process

From first enquiry to a finished court

  1. 01

    Submit Your Site Details

    Tell us the location and available space, and we’ll arrange an on-site evaluation to measure the footprint and check drainage.

  2. 02

    Review the Written Estimate

    You receive an itemised estimate covering subgrade work, base construction, acrylic coating, fencing, and line striping as separate line items.

  3. 03

    Build & Final Sign-Off

    The builder completes all grading, base, surface, and line work, then walks through every specification with you before closing the job.

Pricing Estimates

Typical Tennis Court Installation Prices

JobTypical cost
Residential tennis court surface build$45,000-$75,000
Standard new tennis court$62,000-$136,000
Commercial tennis court project$90,000-$140,000
These prices are estimates and often vary with the condition, size and scope of each job. Message or call us for a free, no-obligation quote.
See all prices

Common Questions

Questions about tennis court installation in San Antonio

How much does it cost to install a tennis court?

Most residential tennis court installations come in at $45,000-$75,000, depending on surface type, base depth, fencing, and site conditions. Grading a sloped lot or adding lighting pushes the total higher. An on-site evaluation gives you an itemised written estimate before any work begins.

What makes the price of a tennis court go up or down?

Surface choice, base depth, fencing height, lighting, and the amount of grading required are the main cost drivers. A flat lot with stable soil costs less to prepare than a sloped or rocky site. Extras like windscreens, ball machines, or seating add to the total.

How much land do I need for a tennis court?

A regulation singles court is 78 feet long by 27 feet wide, but the full play area including run-off space requires roughly 120 feet by 60 feet. For a doubles court with comfortable clearance, plan for at least 7,200 square feet of usable, reasonably flat ground.

Can my backyard fit a full-size tennis court?

A full court needs a footprint of approximately 120 by 60 feet, so most standard suburban lots are too small. Larger residential lots of half an acre or more often have enough room. An on-site evaluation confirms whether your specific yard can accommodate the court and required run-off zones.

Do I need special drainage or grading for my lot?

Every court needs a consistent 1-percent cross-slope so water runs off the surface rather than pooling. Lots with poor natural drainage or heavy clay soil may also need a perimeter drain or subsurface system. The on-site evaluation identifies what your specific lot requires before the estimate is written.

How is a tennis court installed?

The process runs from site evaluation and grading through base installation, surfacing, fencing, line marking, and a final walkthrough. The base -- either asphalt or concrete -- is the most critical phase, as its thickness and compaction determine how long the surface lasts. Each stage is completed before the next begins. Learn more at Court Design & Site Preparation.

Will you handle grading, drainage, and base work?

Yes. The itemised written estimate covers base preparation including grading and drainage alongside surfacing, fencing, and line marking. All of that work is coordinated through one project rather than handed off to separate contractors. The final walkthrough confirms every element meets spec before the job is signed off.

Will a cheaper build last, or do I need a better surface and base?

Base quality is the deciding factor. A thin or poorly compacted base will crack within a few years regardless of the surface applied on top. Spending more on proper base depth and compaction upfront consistently produces a longer-lasting court than saving money there and choosing a premium surface coating.

More questions about Tennis Court Installation?

Get a Written Estimate for Your Court

Tell us the site and the sport, and we’ll arrange an on-site evaluation and itemised written estimate before anything is booked.

Request an Estimate