The builder arranges an on-site visit to assess the existing base condition, drainage path, and available footprint. For HOA communities and school campuses across the San Antonio metro, that assessment often reveals drainage grading or base repairs needed before a new surface can go down, details that change the scope if found mid-project rather than before pricing begins.
Surface and sport selection follows the site review. Options include a concrete or asphalt base with an acrylic court coating, striped for multiple sports on a single surface. Polypropylene sport tiles are an option where a removable or overlay surface is preferred over a bonded coating, particularly on sites where thermal movement or heavy daily use makes a rigid bond a risk.
Full-scope delivery includes perimeter fencing, gate installation, LED court lighting, net posts, and backboards, all itemised separately in the written estimate so the board or facility manager can see exactly what each element costs. A final walkthrough with the facility representative is completed before the job is signed off, confirming every scope item has been delivered as agreed.
Why Choose Us
Why San Antonio Sports Courts for institutional court projects
Accountability and process matter on multi-stakeholder projects, here is what we bring to HOA, school, and commercial builds.
Written Estimate Before Any Work Starts
Every scope item, base prep, surfacing, fencing, lighting, striping, is listed separately before the project is booked.
Site Visit Included at No Commitment
We arrange an on-site evaluation of the space and drainage before you agree to anything or sign off on a price.
Scoped to Institutional Sites
We connect HOA boards and school campuses with builders experienced in high-use, multi-stakeholder court projects.
Full-Scope Coordination in One Job
Fencing, lighting, net systems, and surface work are scoped together so nothing is left to a separate contractor later.
Final Walkthrough Before Sign-Off
A facility manager or board representative reviews the completed court before the job is formally closed out.
Questions HOA boards & facility managers ask before committing
Do I need a full new court or just resurfacing?
It depends on the base condition. If the existing base is structurally sound with no major heaving or drainage failure, resurfacing is usually enough. If the base has shifted, cracked through, or holds standing water, a full rebuild is the right call. An on-site evaluation will confirm which path makes sense before any work is quoted.
Will a new court fix standing water or cracking by itself?
No. A new surface laid over poor drainage or an unstable base will crack and pond water again within a few seasons. Drainage and grading have to be corrected at the base level first. Skipping that step means paying for the same repairs twice. The site evaluation identifies drainage problems before surfacing work begins.
How do I know if my court needs resurfacing or full replacement?
Surface-level cracks, fading, and minor roughness typically point to resurfacing. Base heaving, large alligator cracking, persistent standing water, or sections that flex underfoot usually mean the base itself has failed and needs replacement. An on-site evaluation is the only reliable way to tell the difference before committing to either option.
Is my site big enough for the court layout I want?
A regulation pickleball court needs roughly 30 by 60 feet of clear space; a full tennis court needs about 60 by 120 feet with run-off room. HOA and school sites often have enough footprint but need grading or fencing adjustments to make the layout work. The site visit measures the usable area and flags any constraints. See court design & site preparation for more on layout planning.
Can drainage and grading be fixed as part of the court project?
Yes. Drainage correction and grading are part of base preparation, which is included in the itemised estimate. Addressing them during the court project is more cost-effective than treating them as a separate civil works job. The site evaluation identifies the extent of grading needed before any pricing is confirmed.
Why does the project cost more once the old court is opened up?
Removing the old surface often reveals base damage, drainage failures, or soil conditions that were not visible beforehand. Repairing those issues is necessary before a new surface can be laid correctly. The itemised estimate covers what is known at the site visit; any additional base work discovered during demolition is documented and discussed before proceeding.
Can the existing base be reused, or does it need to be replaced?
A base can be reused if it is structurally stable, drains correctly, and has no significant heaving or voids. If it has shifted, cracked through, or is holding water, reusing it will cause the new surface to fail in the same ways. The on-site evaluation checks base integrity before any recommendation is made.
How do you keep the court from cracking again later?
Cracking is almost always a base or drainage problem, not a surface problem. Correct grading, a stable compacted base, and proper drainage channels prevent the ground movement that causes cracks. Getting those elements right during construction is what determines how long the surface holds up, not the surface coating alone.